BLDG490 - Capstone Building Engineering Design Project
General information
Operating system used | Windows | |
---|---|---|
Software required | Revit, Revit MEP, Carrier E-CAT, H-Sym, DPIPE, DUCTSIZE, ETABS, HAP, HVAC, SAFE, SAP 2000, Energy Pro, SPIPE, Sage Timberline, Pyrosim, Psychart, ATHENA, Open Studio (Sketch-Up) in H819, THERM (rb), LBL Window, Trane Pipe Designer, RSmeans | |
Software for past sessions |
Fall/Winter 2019 - Revit, Revit MEP, Carrier E-CAT, H-Sym, DPIPE, DUCTSIZE, ETABS, HAP, HVAC, SAFE, SAP 2000, Energy Pro, SPIPE, Sage Timberline, Pyrosim, Psychart, ATHENA, Open Studio, THERM (rb), LBL Window
Fall/Winter 2019 - Revit, Revit MEP, Carrier E-CAT, H-Sym, DPIPE, DUCTSIZE, ETABS, HAP, HVAC, SAFE, SAP 2000, Energy Pro, SPIPE, Sage Timberline, Pyrosim, Psychart, ATHENA, Open Studio, THERM (rb), LBL Window Fall/Winter 2020 - Revit, Revit MEP, Carrier E-CAT, H-Sym, DPIPE, DUCTSIZE, ETABS, HAP, HVAC, SAFE, SAP 2000, Energy Pro, SPIPE, Sage Timberline, Pyrosim, Psychart, ATHENA, Open Studio (Sketch-Up) in H819, THERM (rb), LBL Window, Trane Pipe Designer |
Schedule
Type | Sections | Days | Start | End | Room | Instructor | ||
---|---|---|---|---|---|---|---|---|
Lec | U | 1 | ---J--- | 10:15 | 11:55 | LS 207 |
* Denotes that the room may have changed and might no longer match the copy from the Registrar
Labs
Room | Calendar |
---|---|
H813 | Today This Week This Month |
H815 | Today This Week This Month |
H854 | Today This Week This Month |